Rassau Wind Turbine – CDM Co-ordination

Infinite Energy

December 2011- July 2012

Project Overview

Installation of a 74m 500kW wind turbine on site at a production plant, which was to remain operational throughout the construction phase.

Delivering comprehensive CDM co-ordination support

Steel River consultants were appointed by Garrad Hassan to carry out all aspects of CDM Co-ordination including:

  • Preparation of the site for installation including earthworks and excavation and concreting and foundation works.
  • On-site civil works and design risk assessment.
  • Turbine erection and installation, electrical testing, energisation and commissioning.
  • Development, delivery and on-site enforcement of health and safety requirements.

It was vital to the success of the project that the site remained operational at all times. Steel River successfully met this challenge ensuring the construction area and operational areas were safely separated throughout the execution of the project and that plant operations were not interrupted.

For more information on this project and how we can deliver CDM co-ordination services for your organisation contact us here.