Projects

CDM Co-ordinator and Safety Support Services – Lovedean Solar Farm


Steel River Consultants was commissioned to provide CDM Co-ordinator and safety support services to European company Conergy during the installation of 18,700 photo voltaic panels at their solar farm. Steel River’s responsibilities included:

  • Preparation of the pre-construction information pack
  • Review of project construction phase plans, and
  • Completion and handover of the safety file

Click here to read more about this health and safety project.

Health Safety and Environmental Management – Aldbrough Underground Storage Project


Steel River Consultants provided Health, Safety and Environmental management support to Statoil and SSE who are developing the UK’s largest onshore gas storage facility, our role included:

  • take the project from construction to commissioning phase;
  • develop safety management procedures;
  • conduct incident investigations;
  • liaise with SSE corporate safety management; and
  • carry out community liaison work

Click here to read more about this health and safety project.

CDM Co-ordinator and Site Safety Manager Pulverised Coal Ash Injection Plant


Steel River Consultants provided CDMC and Site Safety Manager services to support Siemens in providing new coal handling and storage, coal preparation, heating and drying, and injection facilities. Steel River Consultants’ support has included:

  • Establishment and development of project CDM risk register
  • Input into technical safety review process, e.g. HAZOP, ATEX, COMAH requirements
  • Preparation and development of a construction phase Health and Safety plan and site procedures
  • Regular liaison with existing SSI site operations

Click here to read more about this health and safety project.

Safety Adviser – Wind Farm Risk Assessments


Steel River Consultants reviewed the potential risks associated with operating a wind farm within close proximity to a major leisure facility and occupied caravan site. During the risk assessment Steel River Consultants reviewed the potential of issues such as:

  • ice throw,
  • lightning, and
  • turbine failure.

Click here to read more about this health and safety project.

Construction Design and Management Co-ordination – Rassau Wind Farm


Steel River Consultants were appointed to carry out all aspects of CDM Co-ordination at an operational plant, responsibilities included:

  • Preparation of the site for installation including earthworks and excavation, and concreting and foundation works
  • On-site civil works and design risk assessment
  • Turbine erection and installation, electrical testing, energisation and commissioning
  • Development, delivery and on-site enforcement of health and safety requirements

Click here to read more about this health and safety project.

Construction and Design Management Co-ordination and Project Safety Advice – Humber Gateway Wind Farm


Steel River Consultants are providing CDMC and project safety advice services to E.ON Climate and Renewables UK to support them in the discharge of their CDM and health and safety responsibilities. Involvement on the project has included:

  • Preparation of a high level Occupational Health & Safety Management System
  • Identification of CDM processes and standards
  • Identification of solutions to aid safe fabrication, transport, installation, operation and maintenance
  • Development of an Offshore Works Construction Phase Health and Safety Plan

Click here to read more about this health and safety project.

Construction and Design Management Co-ordination – South Tyne and Wear Waste Management Partnership


Steel River Consultants were appointed by SITA to undertake the role of CDM Co-ordinator on behalf of the South Tyne and Wear Waste Management Partnership.

This support has included liaison and review across all design disciplines involving architectural, civils, structural, mechanical and electrical packages to ensure appropriate account has been taken of health and safety aspects in construction, operation, maintenance and future demolition.

Click here to read more about this health and safety project.

Construction Design Management Co-ordination – New Warlands Farm


Steel River Consultants worked closely with the design architects and the North East Autism Society to ensure the highest levels of effective CDM Co-ordination were applied throughout phase 2 of the New Warlands Farm project.

Phase 2 consists of a full refurbishment/fit out of the currently unoccupied first floor space to include:

  • Construction of additional offices and classrooms
  • Installation of windows
  • Construction of a mezzanine floor
  • Installation of a lift

Proactive dialogue was established throughout the planning stages with the design team through design co-ordination workshops and meetings, alongside interfacing with NEAS.

Click here to read more about this health and safety project.

CDM and Safety Support Services – Rampion Offshore Wind Farm


Rampion Offshore Wind Farm (ROWF) is a Round 3 project comprising (when constructed) of up to 116 Wind Turbines in depths of between 19m – 40m and have a maximum total output of up to 400MW.  One offshore substation will collect the electricity from the wind farm and transmit to a landing point near Worthing via two subsea cables.  From Worthing up to six onshore cables will carry the power to the existing National Grid substation via a 26.4km route through Sussex.

Click here to read more about this health and safety project.