Project Overview

Rampion Offshore Wind Farm (ROWF) is a Round 3 project comprising (when constructed) of up to 116 Wind Turbines in depths of between 19m – 40m and have a maximum total output of up to 400MW.  One offshore substation will collect the electricity from the wind farm and transmit to a landing point near Worthing via two subsea cables.  From Worthing up to six onshore cables will carry the power to the existing National Grid substation via a 26.4km route through Sussex.

Project Deliverables

Deliverables to the project include but are not limited to the following:

  • Production of pre-construction information for various work packages.
  • Vendor competency reviews (CDM and HSE compliance).
  • Production of Construction Phase Plan.
  • Organisation of safety days.
  • CDM Training.
  • HSE advice and support to project team throughout the duration of the project.
  • Consultation and liaison with site operational team in the development of project specific documents (where applicable).
  • Development of supporting HSE documentation.
  • Development of project induction material and delivery.
  • Attendance and participation at various project meetings.
  • Review of contractor RAMS prior to submission to site operations team.
  • Ensuring delivery of proactive safety indicators i.e. number of safety audits/inspections and completion of actions.
  • Collation of project statistics (KPI’s).
  • Attendance and participation at accident/incident investigations.
  • Monitoring of contractor health and safety throughout the various stages for the project.
  • Production and management of HSE risk register.